[email protected]
+63 2 8831 3802

Project Portfolio

Mt. Makiling Laguna
Mt. Makiling Laguna
Mt. Malinao and Tiwi RS-GIS Analysis
Mt. Malinao and Tiwi RS-GIS Analysis
Chevron Tiwi Geothermal Field
Chevron Tiwi Geothermal Field

Philippine Geothermal Production Corporation (PGPC)

In 2015, PGPC entered in a two-year contract with PGEI with the objective of verifying the structural controls of PGPC’s geothermal fields in both Tiwi and MAKBAN. The contract was renewed for another 2 years from 2018 to 2020.

Projects

  • Tiwi Geothermal Project, Albay
    2015 – Structural Mapping
    2016 – Structural Mapping and Well Sitting
  • MAKBAN Geothermal Project, Laguna
    2017 – Structural Mapping
  • Mt. Malinao
    2018 – Magnetotelluric and Gravity Survey

Outline of Services Rendered

  • Structural re-evaluation of Tiwi and MAKBAN geothermal fields
  • Wellsite geology of Tiwi geothermal field
  • Technology transfer

Planned Activities

  • 2018 – Magnetotellurics Survey of Tiwi Geothermal Field
  • – Structural Mapping Phase II of Tiwi Geothermal Field

Brief Summary

In 2015, PGPC entered in a two-year contract with PGEI with the objective of verifying the structural controls of PGPC’s geothermal fields in both Tiwi and MAKBAN. In addition, PGEI is set to handle all wellsite geology aspects of PGPC’s new, re-entry, and worked-over wells. In both activities, PGEI is set to train, advise and guide PGPC geologists.

The project commenced with the successful remapping and updated evaluation of the structural controls of the Tiwi field. Wellsitting in two workover wells and one re-entry well was done. Hands-on training for PGPC geologists was also provided. Structural mapping and re-evaluation of the MAKBAN field, and wellsitting for the upcoming geothermal production and workover wells is currently being conducted.